Favorite | 中文版
  最新资讯
最新资讯
 
最新资讯
SDV 新车间
Updated:2009/9/4  Browse:4477Times

new workshop of SDV, “Special Developed Valves”, including special design, special material and special testing.

  • ● 9800 sq.m.;
  • ● 2 sets 10 Tons travelling crane & 2 set 5 Tons travelling crane;
  • ● Estimate to prepare on the end of Oct. 2009;
  • ● Equip new and modern enquipments;
  • ● Large CNC centers;
  • ● ......

A picture showed the satutus of Sep.15 2009.